Technical Q&A with MIG, Inc.

<< Previous  
 
Next >>
The Los Alamos County Council set up a public meeting on July 7, 2011 so that the NM502 Study contractor, MIG, Inc., could respond to technical questions regarding the proposed modifications to Trinity Drive and East Road. The twelve questions submitted by Joel Williams and myself for MIG on June 2 are available as an Adobe Acrobat (pdf) file by clicking here. Several other participants contributed a number of other questions.
On June 24, MIG submitted their extensive responses and their (First) "Draft Final Report" (Adobe pdf file, 2.3MB).
The July 7th Q&A meeting occurred while Los Alamos was still "smoked in" from the Las Conchas fire. Los Alamos citizens and two represetatives of MIG and CDM, Inc. discussed questions and responses where the citizens considered that unresolved issues remained.

William Mead submitted to the County Council a detailed assessment of MIG's responses to 46 technical questions. Both the direct responses and the (First) "Draft Final Report" were considered in the evaluation. An executive summary of my assessment of 25 responses is available here. The full assessment is available on request. Of the 46 responses evaluated, I considered 8 issues to be resolved in an acceptable way and 38 of the questions to be addressed with incomplete or unsatisfactory responses.

MIG submitted their (Second) "Final Draft Report" (Adobe pdf file, 2.8MB) on August 16, 2011.